Extensions and loft conversions

Space you already own, opened up.

A rear extension, a side return, a loft or a basement, designed in 3D and built by our own trades. We check permitted development before you spend anything.

A converted attic with two large skylights, a brick pillar and a wooden floor in warm light
Loft
10 to 14 weeks
Rear extension
14 to 20 weeks
Planning
8 weeks, when needed

The point

The cheapest square metre in London is the one under your roof.

A loft adds a bedroom and a bathroom without touching the garden. A side return turns a dark galley into the room the family lives in.

Both are usually possible under permitted development, which means no planning application and no eight-week wait. We check that on day one, in writing, against your house and your borough.

Where an application is needed, the drawings are written with the officer's questions in mind, and the same model becomes the structural and the building control package.

Four kinds of space

Which one is yours.

  • Rear extension

    Three to six metres out into the garden, with roof lights and glazed doors. The kitchen-diner most terraces are missing.

    From £68,000
  • Side return

    The two-metre strip beside a Victorian kitchen, glazed over. Small footprint, biggest change in daylight.

    From £54,000
  • Loft conversion

    Dormer or hip-to-gable, a bedroom with an en suite and a proper staircase. Usually permitted development.

    From £62,000
  • Basement

    Lowering or extending under the house. Engineered, waterproofed and lit, for the rooms that do not need a view.

    From £140,000

How it runs

From the permitted development check to the roof lights.

  1. 01

    Permitted development check

    Your house, your borough, your conservation status, in writing within a week. Most lofts and single-storey rears pass.

    Week 1
  2. 02

    Survey and 3D design

    Measured survey of the house and the garden levels, then the extension in the model with the real glazing and roof lights.

    Week 2 to 4
  3. 03

    Party wall and structure

    Notices to the neighbours, structural engineer's calculations, building control application.

    Week 4 to 8
  4. 04

    Build

    Foundations or roof off, steels, envelope, then the room: services, floors, finishes and the doors to the garden.

    10 to 20 weeks

Questions

Before you write.

Do I need planning permission for a loft?

Usually not. Most loft conversions and single-storey rear extensions fall under permitted development, unless the house is listed or in a conservation area with an Article 4 direction. We confirm it in writing before the design starts.

What about the neighbours' wall?

A loft or a rear extension almost always triggers the Party Wall Act. We serve the notices, appoint the surveyor if the neighbour asks for one, and build the cost into the fixed price.

Can you do the extension and the kitchen together?

That is the point of design and build. The extension and the kitchen inside it are one model, one programme and one price.

Start here

Find out what your house is allowed to become.

A permitted development check in writing within a week, then a survey if you want to go further.